Annex A: Items that do not require JTC's endorsement
-
Installation of machinery inside the factory.1
-
Internal partitioning or re-partitioning that does not result in changes in the factory quantum and change of use. 1
-
Installation of air-conditioning and mechanical ventilation system of land lease factories and JTC-built detached standard factories. 1
-
Installation of sanitary and plumbing system of land lease factories and JTC-built detached standard factories. 1
-
Installation of sewerage and drainage system of land lease factories and JTC-built detached standard factories.
-
Installation of fire alarm, electrical and sprinkler systems.
-
Erection, during construction, of site office, temporary store and builder's shed situated within the boundaries of the site except temporary marine structures.
-
Erection of temporary hoarding and sign boards in connection with any construction work.
-
Additions and alterations to concrete pavement and hardstanging area.
-
Construction of culverts.
-
Erection of flag poles, if they are not at JTC Flatted Factories, Terrace Workshops or T9 Terrace Factories.
-
Signages and temporary banners for Land Lease Factories and JTC Standard Factories. (Refer to Guidelines for Signages at Annex B)
1 Installations in JTC standard factories (tenancy cases), JTC terrace workshops (tenancy cases), JTC T9 factories, JTC flatted factories, multi-storey warehouses, and business park buildings still require JTC's endorsement.
Footnote: Exemption of the above work from endorsement by JTC as landowner should not be construed as exemption from submission to the other building authorities.