Singapore Government
JTC CorporationJTC Corporation
Contact Info | Feedback | Sitemap
Search  Begin search Google
Home
About JTC
Newsroom
Products
Portfolio
e-Services
Policies
Career
Publications
Useful Links
Forms
eAlerts FAQ
Food Zone





Home > Portfolio > Food Zone > Pages > KAFoodLinkSpec.aspx  
Home > Portfolio > Food Zone Printer-friendly VersionEmail this page to a friend

 Specifications

Structure
Prestressed post-tensioned slab-beam/reinforced concrete column on bored piled foundation
Roof
Prestressed concrete flat roof with insulation and water proofing and cement sand panel
External Finishes
Ceramic quartz textured coating
Ceiling Finishes
a) Main Lobby
b) Factory Area
c) Passenger Lift Lobby
d) Cargo Lift Lobby
e) Toilets
f) Loading/Unloading Area
g) Car Park
Gypsum board false ceiling
Skim coat with emulsion paint
Gypsum board false ceiling
Plaster and emulsion paint
Mineral fibre false ceiling
Plaster and emulsion paint
Skim coat with emulsion paint
Floor Finishes
a) Main Lobby
b) Factory Area
c) Passenger Lift Lobby
d) Cargo Lift Lobby
e) Toilets
f) Loading/Unloading Area
g) Car Park

Homogeneous tiles
Concrete topping with waterproofing system
Homogeneous tiles
25mm cement/screed with floor hardener
Homogeneous tiles
Concrete topping
Cement sand screed with floor hardener

Wall Finishes
a) Main Lobby
b) Factory Area
c) Passenger Lift Lobby
d) Cargo Lift Lobby
e) Toilets
f) Loading/Unloading Area
g) Car Park

Cement sand plaster with polyurethane coating
Cement sand plaster with emulsion paint
Cement sand plaster with polyurethane coating
20mm cement/sand plaster and emulsion
Homogeneous tiles
20mm cement/sand plaster and emulsion paint
Cement sand plaster with polyurethane coating

Doors (For Factory Units Only)
Steel fire-rated door facing internal corridor
Solid timber door facing external corridor
Windows
Aluminum frame windows with fluorocarbon coating
Floor Loading
Loading/Unloading Bay and Factory Area
a) 1 st -3rd Storey
b) 4th -6th Storey

15 kN/sq m
12.5 kN/sq m

Ceiling Height
For Factory Units Only                            4.7m
(to underside of beam)
MATV
Tap off point for master central antennae television system is provided on every floor
Lifts
a) 2 nos. passenger lifts
b) 10 nos. of cargo lifts
c) 1 no. handicapped lift
d) 1 no. fire lift

2,000 kg
3,000 kg
2,000 kg
2,000 kg

Docklevellers
9 nos. of 18,000 kg mechanical docklevellers are provided in loading and unloading area with platform size of 2,438mm by 1,828mm
Fire Protection
Hosereels, sprinkler and automatic fire detector system are installed
ACMV
The building is mechanically ventilated
Each unit is provided with its own ventilation fan
Electrical Supply
9MVA supplied by busbars risers with tap off units on every floor
Car Parking
a) Handicapped car park
b) Basement car park
c) Lorry park
d) Motorcycle
e) Container bay

4 lots
160 lots
29 lots
49 lots
20 bays



Last updated on 30 Oct 2006
Privacy Statement  |  Terms of Use  |  Rate This Site Rate This Site    © 2008 Government of Singapore
Best viewed using IE 6.0+ or Netscape 6.0+