Singapore Government
JTC CorporationJTC Corporation
Contact Info | Feedback | Sitemap
Search  Begin search Google
Home
About JTC
Newsroom
Products
Portfolio
e-Services
Policies
Career
Publications
Useful Links
Forms
eAlerts FAQ
Food Zone





Home > Portfolio > Food Zone > Pages > TuasBayMoreInfo.aspx  
Home > Portfolio > Food Zone Printer-friendly VersionEmail this page to a friend

Land Area:        988 - 999 sqm (Intermediate Units)

                           1437 & 1479 sqm (Corner Units)

Floor Area:        1417 sqm (All units except unit1)

                            1429 sqm (Unit 1) 


Level
Floor Area (sqm)
Floor Loading (kN/sqm)
Ceiling Height (m)
Remarks
1st Storey (Production)
365-369
15.0
7.0
Floor to beam
Mezzanine (Office)
229-230
5.0
2.7
Floor to false ceiling
2nd Storey (Production)
552-554
12.5
5.0
Floor to false ceiling
Roof (RC areas only)
NA
10.0
NA
NA

Location
Floor
Wall/Column/Beam
Ceiling
Entrance Pouch
Homogeneous tile
Homogeneous tile
Aluminium strip
Reception Area
Homogeneous tile
Cement/sand plaster & emulsion paint
Mineral fibre board false ceiling
Ancillary Office
Trowel smooth finish
As above
As above
Lunch Room
Homogeneous tile
As above
Calcium silicate false ceiling
Production Areas
Cement screed
As above
As above
Toilets
Non-slip homogeneous tile
Homogeneous tile
As above

Features

Electric Provision

-         Design provides up to a max 600 amps per unit

-         Low Tension Supply

-         Tenants/Lessees shall supply, install and maintain the low voltage cable from PowerGas¡¦s LV board to their main switchboard

Mechanical Ventilation (MV)

-         MV provided to parts of the Production Area 

Flues

-         2 kitchenhood flues and one boiler flue

External Hoist Opening

-         3.0m X 2.9m approx.

Goods Hoist

-         3 landing stops at each floor, including office level

-        Full panels including cage door for ease of cleaning

-         Brand: Mhe Demag

-         Loading capacity: 2000kg

-         Cage size: 1.8m X 1.8m X 2.0m

-         Other features: Installed with scupper drain for Production Areas



Last updated on 12 Dec 2006
Privacy Statement  |  Terms of Use  |  Rate This Site Rate This Site    © 2008 Government of Singapore
Best viewed using IE 6.0+ or Netscape 6.0+