Home > Products > Ready Built > Stack-Up Factory > Pages > SS1000MoreInfo.aspx
|
|
| Address |
2 Woodlands Sector 1 | |
|
|
| Type |
| No. of units |
External Compound (sqm) |
Internal Gross Floor Area (sqm) |
Designated incoming Electrical Supply* |
| 24 |
263-270 |
1212-1293 |
280KVA | | |
| Structure |
Prestressed beam with holocore slab for production floor Reinforced concrete wall for staircases and lifts Post-tensioned beam girder |
Prestressed beam with holocore slab for aerial driveway Aerial driveway loading = LL:17.0 kN/sqm Ramp: 17.0 kN/sqm | | |
| Stack A |
| |
Floor Loading Height |
Ceiling |
| 1st storey production |
|
15.0 kN/sqm |
7.0m |
| Mezzanine |
|
5.0 kN/sqm |
2.8m |
| 2nd storey production |
|
12.5 kN/sqm |
5.0m | | |
| Stack B & C |
| |
Floor Loading Height |
Ceiling |
| 1st storey production |
|
12.5 kN/sqm |
6.0m |
| Mezzanine |
|
5.0 kN/sqm |
2.4m |
| 2nd storey production |
|
10.0 kN/sqm |
5.0m | | |
| External walls |
| General |
Curtain walling, plaster & spray texture coating | |
| Internal walls |
Production Reception/ Lobby |
Plaster & spray coating | |
| Ceiling |
Production Reception/ Lobby |
Skim coat & painting Mineral fibre non-combustible false ceiling | |
| Floor finishes |
Production Reception/ Lobby |
Cement concrete towel smooth finish Homogeneous tiles finish | |
| Windows |
| |
Aluminium framed tinted glass windows | |
| Doors |
| |
Metal fire door, timber laminated door, aluminium framed glass door | |
| Fire protection system |
| |
Automatic sprinkler system, automatic fire alarm, dry risers hosereels, hydrants and fire command centre | |
| Goods hoist |
| |
Loading capacity up to 2000kg Dimension: 1.8m(W) x 1.8m (D) x 2.0m (H) | |
| Lighting |
| |
Emergency lighting and exit signs to comply with the relevant authorities' requirement | | | |
* Tenant/lessee shall suppy, install and maintain the low voltage cable from PwerGas's LV board to own main switchboard
|
|
|
Last updated on 13 Oct 2006
|