Singapore Government
JTC CorporationJTC Corporation
Contact Info | Feedback | Sitemap
Search  Begin search Google
Home
About JTC
Newsroom
Products
Portfolio
e-Services
Policies
Career
Publications
Useful Links
Forms
eAlerts FAQ
Stack-Up Factory





Home > Products > Ready Built > Stack-Up Factory > Pages > SS2000MoreInfo.aspx  
Home > Products > Ready Built > Stack-Up Factory Printer-friendly VersionEmail this page to a friend

Address 2 Woodlands Sector 1
Development site 11 Ha
Type
No. of units External Compound (sqm) Internal Gross Floor Area (sqm) Designated incoming Electrical Supply*
42 463-759 1899-1968 1000KVA
Structure
Prestressed beam with holocore slab for production floor
Reinforced concrete wall for staircases and lifts
Post-tensioned beam girder
Prestressed beam with holocore slab for aerial driveway
Aerial driveway loading = LL:17.0 kN/sqm
Ramp: 17.0 kN/sqm
Stack A
   Floor Loading Height Ceiling
1st storey production   15.0 kN/sqm 7.0m
Mezzanine   5.0 kN/sqm 2.8m
2nd storey production   12.5 kN/sqm 5.0m
Stack B & C
  Floor Loading Height Ceiling
1st storey production   12.5 kN/sqm 6.0m
Mezzanine   5.0 kN/sqm 2.4m
2nd storey production   10.0 kN/sqm 5.0m
External walls
General Curtain walling, plaster & spray texture coating
Internal walls
Production
Reception/ Lobby
Plaster & spray coating
Ceiling
Production
Reception/ Lobby
Skim coat & painting
Mineral fibre non-combustible false ceiling
Floor finishes
Production
Reception/ Lobby
Cement concrete towel smooth finish
Homogeneous tiles finish
Windows
  Aluminium framed tinted glass windows
Doors
  Metal fire door, timber laminated door,
aluminium framed glass door
Fire protection system
  Automatic sprinkler system, automatic fire alarm,
dry risers hosereels, hydrants and fire command centre
Goods hoist
  Loading capacity up to 2000kg
Dimension: 1.8m(W) x 1.8m (D) x 2.0m (H)
Lighting
  Emergency lighting and exit signs to comply with the relevant authorities' requirement
Tenant/lessee shall suppy, install and maintain the low voltage cable from PwerGas's LV board to own main switchboard


Last updated on 15 Dec 2006
Privacy Statement  |  Terms of Use  |  Rate This Site Rate This Site    © 2008 Government of Singapore
Best viewed using IE 6.0+ or Netscape 6.0+