To carry out development or renovation works on land and buildings, you must obtain our consent for your plans.

You will also be required to obtain approval from other authorities such as Urban Redevelopment Authority (URA) and Singapore Civil Defence Force (SCDF).

Exceptions where our consent is not required are listed in Annex A. Approvals from other authorities may still apply.

Applying for plan consent

Step 1: Contact authorities such as URA and SCDF to find out if your plans need to be endorsed by a Qualified Person (QP). If they require QP’s endorsement, your submission must be made by a QP.

For development or renovation works in high-rise spaces, refer to the Space Submission Handbook for more details.

Step 2: Log in to the Construction and Real Estate Network (CORENET) to submit the necessary documents.

  • If your submission is made by a QP, your QP should submit the documents through the ESPro Submission portal for both URA Plan Lodgement and Non-Lodgement
  • If your submission does not require a QP, you should submit your documents through the Online Submission portal

If your submissions call for plans of buildings built by JTC, find out how you can request for them here.

Step 3: We will inform you of the outcome of your application within 10 working days of your submission through CORENET.

To encourage the use of digital services, the application processing fee is temporarily waived for documents submitted through the CORENET.

Documents to submit

The forms and documents listed below are found on CORENET

For works in JTC-built high-rise spaces:
  Forms/documents Drawings* Remarks

Submissions that do not require QP endorsement

  1. 'JTC_LPD_SD_NonQP.XFDX'
  2. Declaration page (page 9-10) of the ‘JTC_LPD_SD_NonQP’ form in pdf format
  3. Professional engineer’s calculations
    and drawings, where applicable.

One set of plans consisting of Key/Site
Plans, Unit Plan and Proposal Plan including Sections and Elevations.

A Gross Floor Area (GFA) table of the Site Plan showing Site Area, GFA,
Quantum Breakdown and Gross Plot Ratio (GPR).

(For cases involving changes in Site Area, GFA, Quantum or GPR).

 

 

If your proposal involves the use
of boilers, chimney, Liquefied Petroleum Gas (LPG) or other
chemicals and gases, you must obtain prior clearance from
National Environment Agency (NEA).

QP submissions

  1. ‘JTC_LPD_SD.XFDX’
  2. JTC(LPD)_SD-LD
  3. URA Authorisation Letter
    (required for URA Lodgement only)
  4. URA EDA Form
    (required for URA Lodgement only)
  5. Professional engineer’s calculations and drawings, where applicable.

*If submitted by a non-QP, Form JTC_LPD_SD_NonQP and all drawings carry both company and professional stamps, and be signed by the tenant or lessee and the Consultant/Licensed Electrical Worker (LEW)/Licensed Plumber (LP), whichever is applicable.

For works on JTC land:
  Forms/documents Drawings* Remarks
Non-lodgement submission
  1. ‘JTC_LPD_SD_NonQP.XFDX’ for Non QP or
    ‘JTC_LPD_SD.XFDX’ for QP
  2. JTC(LPD)_SD-LD
    (required for QP submissions only)
  3. Form A/B
    (for works involving foreshore/waterfront structures
    including dredging and reclamation work)
  4. Appendix H
    (for Industrial Government Land Sales (IGLS) sites)

One set of plans consisting of Key/Site
Plans, Unit Plan and Proposal Plan including
Sections and Elevations.

A Gross Floor Area (GFA) table of the Site Plan showing Site Area, GFA, Quantum Breakdown and Gross Plot Ratio (GPR).

If the proposed development is Plot Ratio Exempted, provide a table of the Site Plan showing the proposed site coverage breakdown as depicted in Plot Ratio Exempted Industries, and also demarcate the corresponding areas.

For New Allocation and Lease Renewal cases, provide an external perspective, landscape plans and design of boundary walls facing public roads.

If your proposal involves the use of boilers, chimney, Liquefied Petroleum Gas (LPG) or other chemicals and gases, you must obtain prior clearance from National Environment Agency (NEA).

If your proposal involves a worker’s dormitory, you must obtain JTC’s consent and prior clearances from:

a) Ministry of Manpower (MOM),
Public Utilities Board (PUB),
Singapore Civil Defence Force (SCDF),
National Environment Agency (NEA) and Land Transport Authority (LTA) for the new dormitory

b) MOM, PUB and SCDF for renewal of the dormitory

URA Lodgement submission

  1. ‘JTC_LPD_SD.XFDX’
  2. JTC(LPD)_SD-LD
  3. URA Authorisation Letter
  4. URA EDA Form
  5. DSTA/CAAS Clearances

*If submitted by a non-QP, Form JTC_LPD_SD_NonQP and all drawings carry both company and professional stamps and be signed by the tenant or lessee and the Consultant.